Vietnam · Customer case
12 MW Multi-Site Industrial Rooftop Portfolio

MarketVietnam
SolutionSV-N580
DeliveryTurnkey support
The challenge
Six operating sites required a common equipment platform, but roof geometry, delivery windows and grid settings differed by factory.
Our solution
SolarVolt created a site-by-site bill of materials within one program, coordinated module batches and supplied commissioning documentation for each inverter group.
The result
The EPC reduced procurement complexity and commissioned the portfolio in phases without mixing equipment or documentation between sites.